Production well No.9 of Talimarjan field. Kultak-Kamashi investment block


Production well No.9 of Talimarjan field. Kultak-Kamashi investment block.  Work to increase hydrocarbon production is carried out by the company
After selecting the optimal location for drilling, a drilling rig was mobilized at the Talimarjan field.  On July 14, 2019, drilling of a new production well No. 9 was started.  The design depth of the well is 3900 meters.  We strive to create the most comfortable conditions for the company's employees at the drilling fields in the conditions of a hot desert climate.  As of today, the depth of the bore-hole has reached 850 meters.